Project: Bovine-RV14A   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Jeff Lawson   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:601.5
Total Flight Time:
Start/Last Date:Jan 28, 2022 - No Finish Date
Engine:Lycoming YIO-390-EXP119 non-cert
Propeller:Hartzell G2YR/N7605W-2X 74 in. dia composite 2-blade
Panel:Dynon Skyview
 
Friendly URL: https://eaabuilderslog.org?s=Bovine-RV14A

Home or Last Project Picture

Jul 11, 2022     Bushings, riveting, and bolts for left wing ribs - (5.0 hours)       Category: Wings
In this session, I started by re-identifying which ribs went in which position using a process of elimination, since it was too hard to read my hand-written numbers on some of the ribs after priming them. Then I completed the hand-squeezing of universal-head rivets that were in 3 ribs, and installed all of the snap-in plastic snap bushings. I also finished countersinking all of the skin holes on the underside of the left wing spar, then protected all of the freshly exposed metal with my Touch-n-prep Alodine pen. Next step was to identify all of the correct length bolts that go through the wing spar and ribs, and slot them into the correct holes since each rib needs two different length bolts depending on its position.

What's next? I need to torque down all of these spar bolts, and then begin riveting in these ribs to the spar. After that, I think it'll be time to start work on the trailing spar.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.